Get notified when this product is back in stock
Physical Specifications
Technical Specifications
Usage & Installation:
Packaging & Dimensions:
|
||||||||||||||||||||||||||||||||||||||||
Because of its immense 500 MCM thickness and structural interlocking armor, this cable carries significant Shipping Reel Weight. A standard master reel can easily tip the scales at several thousand pounds. Your drop-off site must have heavy-duty machinery available—such as a large forklift, skid steer, or crane—to safely offload the wooden spool from the freight delivery truck without causing injury or structural damage.
Yes, for large commercial setups, engineers look closely at Soil Thermal Resistivity (Rho). When a massive 500 MCM line carries over 300 Amps of electricity continuous electrical currents, it naturally generates thermal dissipation. If the surrounding trench soil is tightly packed clay or completely dried sand, it can act like an insulating blanket, trapping the heat and reducing the efficiency of the wire. Backfilling the trench with an engineered fluidized thermal mix or loose, damp dirt helps draw the heat away cleanly.
The outer layer features a highly specialized Chemical and Hydrocarbon Resistant PVC compound. It is specifically formulated to withstand typical industrial contaminants such as diesel fuel, motor oils, grease, and common soil acids. However, if your installation environment involves continuous, prolonged immersion in aggressive industrial solvents or raw chemical pools, it should be isolated inside an additional chemical barrier.
Wire America supplies an extensive inventory of Direct Burial Aluminum MC cable cut by the foot or on master reels. Most cut-to-length orders are processed and shipped within 24 to 48 hours, delivering directly to your shop or jobsite within 2 to 4 business days once in transit.
We ship your order from the regional distribution hub closest to your jobsite to keep transit times and freight costs as low as possible. Expedited shipping options are also available at checkout.
Working against a tight jobsite or inspection deadline? Call our team directly at 833-268-8644 to request priority processing!
While it is designed for direct burial without any pipe at all, you can absolutely pull it through a conduit if your blueprints require it. However, because of its broad armored diameter, you must calculate for Conduit Jam Ratio. Trying to force a thick, three-conductor armored assembly through an undersized elbow turn can cause the cable to bind and lock up mid-pull. Typically, a minimum of a 4-inch or 5-inch rigid schedule 40 pipe run is utilized to guarantee a smooth pull.
Yes. The thick, seamless PVC jacket combined with appropriate liquid-tight MC termination connectors achieves an exceptional Moisture Protection Ingress Rating. It can easily withstand the high-pressure, hot-water chemical washdowns required in food manufacturing, industrial kitchens, and bottling plants without allowing dampness to breach the internal armor layer or oxidize the core terminations.
It is primarily used as a heavy-duty main feeder line for 300A to 350A commercial service panels, industrial distribution boards, agricultural facilities, solar farms, and heavy equipment. Because it features built-in interlocking aluminum armor under a waterproof PVC jacket, it can be laid directly in open trenches or encased in concrete without buying or gluing separate PVC conduit pipe.
(833) 268-8644
Get this thing filled up so you can help Wire America!